Time | Projects |
1/2025-Current | Client: FSM Architecture, Structure, Plumbing & Drainage, HVAC and Fire Service Design of Construction of the New Control Center of the Hong Kong-Zhuhai-Macau Bridge Operation Station of the Fire Department |
1/2025-Current | Client: China Construction (Macau) - China Construction (Hong Kong) Cooperative Management Temporary Support Engineering Design of Construction of Flyover at Zone A & B, New Town |
6/2024-Current | Client: Tong Lei Engineering & Construction Co. Ltd. Foundation, Structure and LV&ELV Design of Construction of Underground Pedestrian Passage of Central District, Zone A, New Town |
4/2024-11/2024 | Client: DSOP Architecture, Structure, LV&ELV, Plumbing & Drainage Design of Construction Project of Macau Outdoor Performance Area |
3/2024-Current | Client: China Construction Engineering (Macau). Co., Ltd. LV&ELV, ELE, Plumbing & Drainage, HVAC, Fire Service & LPG Design of
Construction of Public Housing Project at Lot B8, Zone A, New
Town |
3/2024-Current | Client:
Ming Shun Construction & Property Investment Ltd. Architecture, Foundation & Structure Design of Construction of Public Housing Project at Lot B5, Zone A, New Town |
3/2024-Current | Client:
Tong Lei Engineering & Construction Co. Ltd. Foundation, Structure and Plumbing & Drainage Design of Construction of Public Housing Project at Lot B11, Zone A, New Town |
4/2023-Current | Client:
Tong Lei Engineering & Construction Co. Ltd. Architecture, Foundation & Structure, ELS, ENV, LV&ELV, Plumbing & Drainage, HVAC, Fire Service & Road Design of Common Pipeline and Road Design Construction Project - South District, Zone A, New Town |
1/2024-Current | Client:
IASM Architecture, Foundation & Structure Design of the Center for Disaster Victims at Ilha
Verde Power Supply System Renovation Project Design Consultancy Service |
7/2023-06/2024 | Client:
DSOP Architecture, Structure, Plumbing & Drainage and Landscape Design of Improvement Work
at Estrada da Barragem de Ka Ho |
4/2023-Current | Client:
Tong Lei Engineering & Construction Co. Ltd. Architecture, Foundation & Structure, ELS, ENV, LV&ELV, Plumbing & Drainage, HVAC, Fire Service & Road Design of Common Pipeline and Road Design
Construction Project - Central District, Zone A, New Town |
3/2022-Current | Client:
DSOP Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service
Design of Construction of Recreation and Sports Facilities Building at Lot A9, Zone A, New Town |
2/2022-Current | Client:
Studio R Plus Company Limited Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design Consultancy Service of Renovation of Asphalt Plant, Lot G4, Industrial Zone, Seac Pai Van, Coloane |
1/2022-Current | Client:
China Construction Engineering (Macau) Co., Ltd. LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of Public Housing
Project at Lot A4, Zone A, New Town |
1/2022-Current | Client:
China Construction Engineering (Macau) Co., Ltd. Foundation, ELS, Structure, ENV Design of Construction of Public Housing Project at Lot A2, Zone A, New Town |
12/2021-Current | Client:
Studio R Plus Company Limited Architecture, Structure, LV&ELV, Plumbing, HVAC & Fire Service Design Consultancy Service of Renovation of Concrete Plant, Lot P2, No.75-131, Rua Wo Mok, Pac On, Taipa |
8/2021-12/2023 | Client:
Sun Hung Yip Engineering Construction Co. Limited Architecture, Structure & LV&ELV, Plumbing & Drainage, HVAC, Fire Service Design of OPSS Pearl of the Orient Substation |
8/2021-12/2021 | Client:
Filhas Canossianas da Caridade Roof Leakage Repairing and Exterior Wall Renovation of Sacred Heart Canossian Kindergarten |
7/2021-9/2022 | Client:
IASM HVAC Design for Mong Ha Social Housing Phase II Nursery and Accomodation for the Disabled and Comprehensive Service Center |
5/2021-6/2023 | Client:
Focus Design Limited Review Plumbing & Drainage Design for Wynn Palace Peripheral Engineering |
5/2021-Current | Client:
DSOP Architecture, Foundation & Structure, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of Construction of Public Office Building in Lot 25 in the Outer Harbour New Reclamation Area |
4/2021-Current | Client:
Marreiros Arquitectos Associados Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Villa
at Estrada da Penha, No. 493 |
3/2021-Current | Client:
DSOP Architecture, LV&ELV, Plumbing & Drainage, HVAC and Fire Service Design of Transportation Hub Optimization Project-Overall Technical Consultancy Service at Estrada Governador Albano de Oliveira, Taipa |
10/2020-11/2024 | Client:
IASM Architecture, LV&ELV, Plumbing & Drainage, LPG and HVAC Design of Dementia Comprehensive Service Centre of Fai Chi Kei Lot E & F, R/C and 3/F |
8/2020-10/2024 | Client:
Hong Kong Huayi Design Consultants (Macau) Limited Retaining Support of Foundation Pit at Lot P, New Reclamation Area at Areia Preta |
5/2020-Current | Client:
Hai Ou Construction Co. Limited Structural Strengthening Design of Adjacent Shops of Hotel Project, Phase II at Av. de Almeida |
4/2020-Current | Client:
DIRT Bike Sports Development Limited Structure, LV&ELV and Plumbing & Drainage Design of Mountain Bike Yard at Black Sand Beach |
9/2019-10/2022 | Client:
SAAM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC and Fire Service Design of Legalization Project at Lot A2 Water Purification Plant, Seac Pai Van |
1/2019-12/2023 | Client:
IASM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Interior Fit-out Works of Social Facilities of Fai Chi Kei Public Housing at Fai Chi Kei North Van Lot L4 & L5 |
12/2018-Current | Client:
Macau University of Tourism Architecture, Structure, LV&ELV, Fire Service, HVAC Design and Planning Service of New Educational Hotel of Macau University of Tourism. |
1/2019-Current | Client:
AGC Design Limited Review Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire
Service Design and Act as Authorized Persons in Project Submission to PWD of Redevelopment of Catholic Centre |
1/2021-3/2021 | Client:
ICM Foundation Design of No.18, 20 and 22 at Pátio da Eterna Felicidade |
5/2020-3/2021 | Client:
Hai Ou Construction Co. Limited Structural Strengthening Design of Adjacent Shops of Hotel Project, Phase II at Av. de
Almeida |
4/2020-12/2020 | Client:
R’s Bike Maker Shop Structure, LV&ELV and Plumbing & Drainage Design of Children Four Wheel Yard at
Black Sand Beach |
4/2020-12/2020 | Client:
DIRT Bike Sports Development Limited Structure, LV&ELV and Plumbing & Drainage Design of Mountain Bike Yard at Black
Sand Beach |
12/2019-6/2021 | Client:
DSSOPT Architecture, LV&ELV, Plumbing & Drainage, LPG & HVAC Design of China and
Portuguese- speaking Countries Business Cooperation Service Platform Complex Office |
11/2019-10/2020 | Client:
IPM Architecture, LV&ELV, HVAC and Fire Service Design of Gambling Teaching and Research Center Campus Restoration and Renovation Project |
7/2019-8/2019 | Client:
Tak Fat Kin Ip Engineering Company Limited Tender Design for Qing Mao Port Footbridge |
2/2019 | Client:
Macau Fisherman’s Wharf International Investment Limited Structure Design of Macau Fisherman’s Wharf Dinosaur Museum Remodeling Hotel |
1/2019-12/2021 | Client:
Suez Infrastructure (China) Company Limited – Macau Branch Review Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design and Act as Authorized Persons in Project Submission to PWD of Macau Peninsula Waste Water Plant |
11/2018-8/2020 | Client:
GDI Architecture, LV&ELV, Plumbing & Drainage, HVAC and Fire Service Design of G/F and
B/2 of Lotus Road Heavy Car Park |
9/2018-1/2021 | Client:
Filhas Canossianas da Caridade Architecture, LV&ELV, Plumbing & Drainage, LPG, HVAC Design of Renovation and
Extension of Sacred Heart Canossian College |
7/2018-5/2020 | Client:
SMG Architecture, LV&ELV, Plumbing & Drainage, LPG, HVAC of Forecasting Room and Gate Meteorological Monitoring Center Design Services |
6/2018-12/2019 | Client:
GIT Supplementary Service of Optimization design of Macau Light Rapid Transit Phase 1 Segment
C250 |
5/2018-5/2024 | Client:
IACM Structural Repair and Reinforcement Design of Red Market |
5/2018-12/2020 | Client:
DSSOPT Architecture, LV&ELV, Plumbing & Drainage & HVAC Design of SMG Building |
12/2017-9/2019 | Client:
IASM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Rejuvenation Centre |
9/2017-12/2018 | Client:
IASM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Tung Sin Tong the Third Nursery |
7/2017-12/2017 | Client:
IPM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service
Design of Renovation of Stratified Unit, 19 andar, Centro Walorly |
6/2017-12/2018 | Client:
Marine and Water Bureau Space Planning, Architecture, LV&ELV, Plumbling
& Drainage, HVAC, LPG & Fire Service Design of Staffs Dining Kitchen
of Marine and Water Bureau Building. |
6/2017-12/2021 | Client: BLA Consultores de Arq. e Eng. Lda. Foundation and Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Temporary Fire Service Operation Station at Ilha Verde |
3/2017-12/2021 | Client:
Degremont Asia Ltd. (Macau Branch) Review Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design and Act as Authorized Persons in Project Submission to PWD of
Water Purification Plant at Seac Pai Van, Cotai |
3/2017-11/2020 | Client:
GDI Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Interior Fit-out Works of Social Facilities of Fai Chi Kei Public
Housing at Fai Chi Kei Lot E & F and Fai Chi Kei North Van Lot L4 & L5 |
3/2017-11/2019 | Client:
IASM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of St. Joseph Nursery |
11/2016-12/2019 | Client: BLA Consultores de Arq. e Eng. Lda. Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of ICM
Museum of Literature, at Rua de Abreu Nunes |
11/2016-12/2018 | Client:
OBS Arquitectos Lda. Structure, LPG & Fire Service Design of Fire Department Headquarter and Cotai Operation Station |
11/2016-12/2018 | Client:
SAAM Protection Method Design of LPG Pipe at the Excavation Location of Water Supply Project of Cotai Lisboa Palace |
11/2016-3/2017 | Client:
SAAM Demolition Method Design of S.A.A.M Mechanical Equipment Room Located at Ilha Verde |
9/2016-04/2020 | Client:
GDI Design of Whole Macau City Electronic Monitoring System (Stage 4) |
9/2016-6/2019 | Client:
MLD Cabo Verde Resorts S.A. Foundation and Structure Design of Cape Verde Integrated Resort & Casino Santa Maria
Islet, Praia |
8/2016-9/2016 | Client:
EHY Construction and Engineering Co. Limited Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of CEM CCA-CCB New Seawater Cooling System |
7/2016-10/2016 | Client:
ICM LV&ELV Design of 2/A, Phase 1, Ocean Industrial Building Stack Room |
6/2016-12/2016 | Client:
ICM Fire Service Design of Casa de Lou Kau |
10/2015-4/2019 | Client:
GDI Preliminary Planning Study of Public Facility Complex - Lot 1 at Avenida do Comendador Ho Yin |
4/2015-12/2016 | Client:
Human Design (Macau) Ltd. LV&ELV Design of Macau Fisherman’s Wharf Palace Building Office |
1/2015-12/2017 | Client:
DSSOPT Additional of Lift at Footbridge beside Nam Fong Building at Avenida da Ponte da Amizade |
12/2014-11/2018 | Client:
Marrero’s Arquitectos Associados Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Henry Fok Foundation Macau Headquarter Building Extension |
12/2014-11/2018 | Client:
Marrero’s Arquitectos Associados Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Tap Seac Square Commercial Centre |
12/2014-12/2016 | Client:
Marrero’s Arquitectos Associados Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Villa at Estrada da Penha, No.493 |
12/2014-12/2015 | Client:
Marine and Water Bureau Recycled Water Pipe Network Laying at Seac Pai Van and Heng Qin UMac |
11/2014-10/2017 | Client:
Shun Wo International Property Co., Limited Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service of Lot TN21a Development Project |
6/2014-2/2018 | Client:
DSSOPT Architecture, Structure, LV&ELV, Plumbing & Drainage and Urban Integration Design of Underground Drainage at Avenida Kwong Tung |
6/2014-7/2016 | Client: BLA Consultores de Arq. e Eng. Lda. Structure and Plumbing & Drainage Design of
Dwelling at Avenida de Sidonio Pais |
3/2014-2015 | Client: Companhia de Arquitectura e Design Chan Kam Lda Structure and Plumbing & Drainage Design of Helicopter Repairing Garage and Landing
Pad at Lot LT7, E2 |
2/2014-12/2017 | Client:
GDI Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service
Design of Car Park of Hong Kong-Zhuhai-Macau Bridge Macau Port Management
District |
1/2014-1/2017 | Client:
DSSOPT Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of 70m High Level Water Tank at Guia Marco |
11/2013-2014 | Client:
ICM Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Ruins of St. Paul |
10/2013-11/2015 | Client:
Office of Education Department Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Improvement of Escola Primaria Oficial Luso-Chinese “Sir Robert Ho Tung” |
10/2013-2014 | Client:
Largo do Lilau Property Development Limited Structural Strengthening Design of Largo do Lilau No.27/Rua da Lilau No. 1 |
8/2013-6/2016 | Client:
SAAM Structure and LV&ELV Design of Alteration Work of MSR3 Water Plant Project |
8/2013-11/2014 | Client:
Tak Fat Kin Ip Engineering Company Limited Structural Strengthen Design of No.7-31, Patio do Mungo |
8/2013-12/2013 | Client:
Pou Sheng Property Dev. Consul. Co . Ltd. Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of No.7-31, Patio do Mungo |
7/2013-2014 | Client: ICM Structure and LV&ELV Design of Avenida da Horta e Costa No.95, C&D |
6/2013-12/2014 | Client:
DSSOPT Revised Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of SMG – Laser Radar Laboratory |
5/2013-5/2015 | Client:
DSSOPT Architecture, Structure, LV&ELV, Plumbing & Drainage, Fire Service Design of Reconstruction of Pontoon of Ilha Verde Custom |
4/2013-2014 | Client:
PRIC, PRISRC Architecture & Structure Design of Temporary Flood Control Works of Interior Harbour |
3/2013-10/2015 | Client:
EHY Construction and Engineering Co. Limited Structure, LV&ELV, Fire Service Design of Wynn Power Station |
3/2013-2014 | Client:
New Yaohan New Architecture, Structure and LV&ELV Design of New Yaohan LED |
2/2013-5/2017 | Client:
DSSOPT Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service
Design of Remedial Work of the Water Tank in Flora |
2/2013-12/2016 | Client:
ICM Structure, LV&ELV & Fire Service Design of Dock Manager Office of Carlos the
First and Mechanical Room |
2/2013-12/2014 | Client:
GDI Preliminary Study of Temporary Loading Bridge of Hong Kong-Zhuhai-Macau Bridge Macau Port
Management District |
2/2013-2014 | Client:
EHY Construction and Engineering Co. Limited Structure and LV&ELV Design of Substation of LRT System (Border Gate Station & Sai Van Station) |
2/2013-2014 | Client:
EHY Construction and Engineering Co. Limited Architecture, Structure and LV&ELV Design of Studio City Substation at Cotai Macau |
1/2013-3/2017 | Client:
ITC Properties Group Ltd. Structure, Plumbing & Drainage, Fire Service Design of Casino Royale Project |
2012-3/2017 | Client:
Macau Legend Development Ltd. Structure, LV&ELV & Fire Service Design of Slot Machine Factory |
2012-2016 | Client:
Macau Fisherman’s Wharf International Investment Limited Structure & Fire Service Design of Macau Fisherman’s Wharf Phase 1 Stage 2 |
11/2012-2/2023 | Client:
Orient Town Project Management Ltd Structure, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of Government Building and School at One Oasis Lot 12a |
8/2012-2014 | Client:
ICM Structure, LV&ELV & Fire Service Design of Rua da Lilau No.16 |
5/2012-2014 | Client:
ICM Architecture, LV&ELV & Fire Service Design of Tung Lee Industrial Building - Stack |
3/2012-2015 | Client:
PRIC, PRISRC Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service
Design of Cotai Power Station Warm Drainage System |
3/2012-2014 | Client:
GDI Leakage Remedial Proposal of Sai Van Lake Plaza underground tunnel |
1/2012-2014 | Client:
IASM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service
Design of Taipa Obra das Maes Nursery Interior Work |
2012-2014 | Client:
Nam Kwong Natural Gas Company Architecture Design of Gas Receiving Station in Coloane |
2012-2013 | Client:
Montessori Educational Center Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Montessori Educational Center |
2012-2013 | Client: Companhia de Arquitectura e Design Chan Kam Lda LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Music College Structural Strengthening Design of Building at No.69-81, Rua da Ribeira do Patane |
2011-6/2021 | Client:
GDI Architecture, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of
Social Facilities of Mong Ha Social Housing Phase II |
12/2011-12/2019 | Client:
GIT Foundation, Architecture, Structure, Plumbing & Drainage, LV&ELV, HVAC, Fire
Service Equipment, Urban Integration and Landscaping Design of Viaduct and stations of Macau Light Rapid Transit Phase 1 Segment C250 |
11/2011-10/2016 | Client:
Marrero’s Arquitectos Associados Foundation & Structure, Plumbing & Drainage Design of Macau Public Security Police Force |
8/2011-5/2016 | Client:
GDI Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of Transportation and Public Facilities of Social Housing Project at CN6b in Seac Pai Van |
2011-2015 | Client:
PRIC, PRISRC Verification Study of the Temporary Discharge Facility and Equipments Design for Relocation of Discharge Facility of Waste Water Treatment Plant in Macau Peninsula |
2011-2014 | Client:
ICM Structural Strengthening Design of Building at No.69-81, Rua da Ribeira do Patane |
05/2010-09/2017 | Client:
GDI Reclamation Design for the New Town E1 Reclamation Area and Seawall Construction Design |
2/2010-5/2020 | Client:
Kong Sing Real Estate And Development Co. Ltd. Structure, LV&ELV & Fire Service Design of Mesquita Residential Project |
2010-5/2016 | Client:
Mr. Lam Tak Va Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of Residential Project at Rua do Visconde Paco de Acros |
2010-2014 | Client:
Ms. Leung Pui San Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Residential Project at No.23 Rua do Cunha, Taipa |
2010-2013 | Client: CB Moreno Arq. Associados, Lda. Structure, Plumbing & Drainage, LV&ELV & Fire Service Design of CN3 in Seac Pai Van |
2010-2013 | Client:
IASMIASM Architecture, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Chu Kwong Center |
2010-2012 | Client:
New Design Limited Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Residential Project at Rua dos Mercadores |
2010-2011 | Client:
MPOF MACAU (SITE 3) LIMITED Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of Residential Project at Rua do Laboratorio |
2010-2011 | Client:
SAAM Architecture, Structure, LV&ELV Design of Warehouse in Seac Pai Van |
2010-2011 | Client:
GDI Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC & Fire Service Design of Air-Conditioned Waiting Room in Underground Bus Terminal at Border Gate Plaza |
2010-2011 | Client: CC, Atelier de Arquitectura, Lda Structure & Road Design of Macau Caesars Golf Club House |
2010-2011 | Client: Tecproeng Macau Plumbing & Drainage Design of Macau Caesars Golf Club House |
2009-8/2015 | Client: VLB Arquitectura e Planeamento Lda Structure Design of Public Housing in Fai Chi Kei |
2009-2013 | Client:
DSSOPT Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC, LPG & Fire Service Design of SMG – Laser Radar Laboratory |
2009-2011 | Client:
GDI Architecture, LV&ELV, HVAC & Fire Service Design of Footpath to Praça de Ferreira do Amaral |
2009-2010 | Client:
Long Chon Construction & Engineering Co. Ltd. Structure, LV&ELV & Drainage Design of Pedestrian Overbridge on the Ocean Ave., Taipa |
2008-2014 | Client:
New Design Limited LV&ELV, HVAC, Fire Service Design of Mandarin’s House |
2008-2013 | Client:
Polytex Corporation Limited LV&ELV, HVAC, Fire Service Design of Economic Housing at Lot 4 in Ilha Verde |
2008-2011 | Client: Banco Delta Asia Modification Design for Delta Asia Bank Branches at Rua do Campo, Av. de Almeida Ribeiro and Conselheiro Ferreira de Almeida |
2008-2009 | Client:
IASM Architecture, LV&ELV, Plumbing & Drainage, HVAC, Fire Service Design of Tong Chan
Nursery |
2008-2009 | Client:
IASM Architecture, LV&ELV, Plumbing & Drainage, HVAC, Fire Service Design of Healthy Family and Gambling Counselling Service Center |
2008-2009 | Client:
IASM Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC, Fire Service Design of Chong Kong Rehabilitation House |
2008-2009 | Client:
DSSOPT Architecture, Structure, LV&ELV, Plumbing & Drainage, HVAC, Fire Service Design of Bus Driver's Cabin in A-Ma Central Station |
2007-2012 | Client:
IACM Structure, LV&ELV, Plumbing & Drainage, HVAC,& Fire Service Design of Iao
Hon Hawkers Building |
2007-2009 | Client:
New Design Limited Structure, Plumbing & Drainage, LV&ELV, Fire Service Design of Service Apartment at Verde 13-17 |
2007-2009 | Client:
New Design Limited Structure, Plumbing & Drainage, LV&ELV, Fire Service Design of Service Apartment at Verde 12-16 |
2007-2009 | Client:
New Design Limited Structure, Plumbing & Drainage, LV&ELV, Fire Service Design of Service Apartment at Verde 22 |
2007-2008 | Client:
New Design Limited Structure Design of Central Plaza Modification |
2007-2008 | Client: DSSOPT Renovation of Calçada de Surpresa e da Estrada do Visconde S. Januário |
2007-2008 | Client: Sociedade de Jogos de Macau, S.A. Foundation and Structure Design of Hotel Lisboa 3rd Entrance |
2007 | Client:
ARCO Architecture Design and Consultant Company Ltd. LV&ELV Design of Hac Sa and Chuk Wan Youth Hostel |
2007 | Client:
Macau Post Office Conversion Design of Basement of "D. Maria II" Postal Building from Car Park to Storage |
2007 | Client:
Macau Baptist School Architecture, Structure & LV&ELV Design of Added Roof at Baptist School in Flora |
2006-11/2015 | Client:
MHK Limited Structure, LV&ELV, Plumbing & Drainage, HVAC, Fire Service Design of Penha Hill Residential Development |
2006-2008 | Client: CB Moreno Arq. Associados, Lda. Structure, LV&ELV, Plumbing & Drainage, Fire Service Design of Carpark in Cotai |
2006-2008 | Client:
OBS Arquitectos Lda. Structure Design of Cotai Fire Station |
2006 | Client:
Fu Hou Seaview Garden Development Co. Ltd. Structure, LV&ELV, Plumbing & Drainage, Fire Service Design of Lot PO2 in Taipa |
2006 | Client:
SAAM Structure Design of Pump House of Flora Reservoir in Macau |
2005-2006 | Client:
Macau Jockey Club Structure Design of Alteration Work of Macau Jockey Club Stables |
2005-2006 | Client:
DSSOPT Architecture and Structure Design of Iao Hon Car Park |
2005 | Client:
DSSOPT Comprehensive Design of Mechanical Car Park System and Footbridge near Border Gate |
2004-2005 | Client:
Government Information Bureau LV&ELV Design of Government Information Bureau, 15/F China Plaza |
2004-2005 | Client:
IASM Architecture and Structure Design of Kai Chi and Kai Kin Centers |
2004-2005 | Client:
IASM Architecture and Structure Design of House of Homeless |
2003-2004 | Client:
IASM Architecture and Structure Design of House of São Luis Gonzaga |
2002-2003 | Client:
Macau Landmark Structure Design of Macau Landmark Hotel and Casino Conversion Project |
2002-2003 | Client:
SAAM Reconstruction Design of Macao Water Office in Ilha Verde |
2002 | Client:
Office of Education Department Structure Design of Roof at Office of Education Department in Tap Seac |
2001-2003 | Client:
Macau Fisherman’s Wharf International Investment Limited Structure, LV&ELV, Plumbing & Drainage, Fire Service Design of Macau Fisherman's Wharf Phase 1 Stage 1 |
2001-2003 | Client:
Macau Foundation of A-MA Structure Design of Goddess A-MA Cultural Complex |
2001-2002 | Client: DSSOPT Structure Design of Nove Instalações da Capitania dos Portos, Macao |
2001 | Client:
SAAM Structure Design of Seac Pai Wan Pump Station |
2001 | Client:
Nam Kwong Group Structure Design of Gas Station at Av. do Nordeste |
2001 | Client:
ICM Strengthening Design of Building at No.1, Trv. de Felicidade, Taipa |
2001 | Client:
DSSOPT Structure Design of Pedestrian Tunnel outside Hotel Lisboa |
2000 | Client:
Yuet Wah College Foundation Design of Yuet Wah Auditorium |
2000 | Client:
SAAM Structure Design of Taipa T-70 Reservoir |
2000 | Client:
DSSOPT Structure Design of Pedestrian Bridge adjacent to New Yaohan |
2000 | Client: Co. de Fomento Predial Sam Yau Lda. Yin King Yuen Slope Protection Design |
2000 | Client:
DSSOPT Pavement and Drainage Design of Rua da Felicidade |
1999-2000 | Client:
SAAM Foundation and Structure Design of Taipa T-50 Reservoir |
1999 | Client:
DSSOPT Land Reclamation Design for Taipa Hospital |