Engineering Consultancy & Other Services

Time

Projects

12/2023-Current

Client: CEM

Structural Appraisal of Main Substation

4/2022-1/2024

Client: SAAM

Design Consultancy Services of 90,000 ton Facility Maintenance of Ilha Verde Water Plant

11/2016-Current

Client: SAAM

Making As Built Drawings of Taipa T-50 Pond

2012-Current

Client: Yuet Wah College

Design Technical Consultancy Annual Services

8/2020-5/2021

Client: Hong Kong Huayi Design Consultants (Macau) Limited

Design Technical Consultant of Lote P, New Reclamation Area at Areia Preta

8/2020-12/2020

Client: Star World Hotel

Structural Appraisal of Star World Hotel

7/2020-11/2020

Client: GDI

Provide Technical Expert Team Service of Design and Build of Slope Improvement of Public Housing Project (Phase I) at Av. Wai Long, Taipa

1/2019-9/2020

Client: GDI

Design of Pile Load Test at Lot B6, B4, B5, B10 and B9, New Town   Reclamation Zone A

8/2018-11/2018

Client: GDI

Public Office Building Basement Design and Method Statement Review at San Hao Ngon Lot 6K

3/2018-5/2018

Client: Star World Hotel

Structural Appraisal of Star World Hotel

10/2017-4/2018

Client: IASM

Accessibility Inspection and Composing Improvement Report of Social Service   Facilities - Rehabilitation Day Centre

9/2016-12/2016

Client: GDI

Evaluation of Design & Build of the Bridge of Artificial Island and New City Reclamation Zone Zone A

2/2016-4/2016

Client: Star World Hotel

Structural Appraisal of Star World Hotel

2013

Client: Star World Hotel

Structural Appraisal of Star World Hotel

2012-2015

Client: Consorcio de Long   Chon/Tak Fat Kin Ip/Bahh

Independent Checking of Construction Design for Galaxy Resort Phase II   C004N032

2012

Client: Wynn Design &   Development

Consultancy to Review Site Investigation and Soil Improvement in Wynn Cotai   Project

2011-2014

Client: Empresa de Fomento   Industrial e Comercial Concordia, S.A.

Independent Checking of Civil & Structural Design for One Oasis, Macau

2011-2013

Client: SAAM

Structural Consultancy Annual Services

2010

Client: Macau Baptist   College

Compiling the Bills of Quantities of Macau Baptist College Extension   Project

2010

Client: GDI

Feasibility Study for Water Storage of Nam Van Reservoir and Sai Van   Reservoir

2010

Client: PRIC, PRISRC

Geotechnical Inspection for the Feasibility Study for Capacity Increment of   Ka Ho Reservoir

2010

Client: PRIC, PRISRC

Geotechnical Inspection for the Feasibility Study for Water Storage of Nam   Van Reservoir and Sai Van Reservoir

2010

Client: GDI

Preliminary Study on Environmental Impact during Construction of   Urbanization of Seac Pai Van Quarry in Coloane

2009

Client: GDI

Preliminary Study on Connection Plan between University of Macau Site at   Heng Qin and Cotai

2009

Client: Gold Cove Property   Development Co. Ltd.

Coordination and Technical Support in M&E Installation at The   Residencia Macau

2008-2009

Client: CC Atelier de   Arquitectura, Lda.

Design Review and Signing for Caesar Golf Club

2008-2009

Client: Sun Fook Kong - Kun Fai   JV

Independent Checking of Construction Design for Parcels 5 and 6 in Venetian   Resort Project

2007

Client: Fu Hou Seaview Garden   Development Co. Ltd.

Technical Assistance in Property Registration of Taipa Fu Hou Villa

2005-2006

Client: Seng Fok Holding Company   Limited

Serving as Technical Director in Hotel Rio Modification

2004-2009

Client: Leighton-China State   J.V.

Independent Checking of Construction Design for Wynn Resorts Macau Phase I   and II

2004-2006

Client: Galaxy Casino, S.A.

Serving as Authorized Person in Macau Starworld Hotel Structure Design

2002

Client: STDM

External Wall Inspection of Hotel Sintra

2002

Client: Construction Control   Division of Military Troop in Macau

Preparation of Construction Estimate for Macau-Taipa Liberation Army   Headquarter Project

2001-2002

Client: Bank of America

Defect Appraisal of Bank of America Branch Office

2001

Client: JEC Consultants Co.,   Ltd.

Loading Test at 8/F of Zhu Kwong Building

2000

Client: Macau Landmark

Construction Feasibility Study Report of Macau Fisherman’s Wharf Project

1999

Client: SAAM

Water Supply Master Plan Study Years 2000-2004, SAAM

1999

Client: SAAM

Structural Appraisal of Taipa T-70 Reservoir