Time | Projects |
12/2023-Current | Client: CEM Structural Appraisal of Main Substation |
4/2022-1/2024 | Client: SAAM Design Consultancy Services of 90,000 ton Facility Maintenance of Ilha Verde Water Plant |
11/2016-Current | Client: SAAM Making As Built Drawings of Taipa T-50 Pond |
2012-Current | Client: Yuet Wah College Design Technical Consultancy Annual Services |
8/2020-5/2021 | Client: Hong Kong Huayi Design Consultants (Macau) Limited Design Technical Consultant of Lote P, New Reclamation Area at Areia Preta |
8/2020-12/2020 | Client: Star World Hotel Structural Appraisal of Star World Hotel |
7/2020-11/2020 | Client: GDI Provide Technical Expert Team Service of Design and Build of Slope Improvement of Public Housing Project (Phase I) at Av. Wai Long, Taipa |
1/2019-9/2020 | Client: GDI Design of Pile Load Test at Lot B6, B4, B5, B10 and B9, New Town Reclamation Zone A |
8/2018-11/2018 | Client: GDI Public Office Building Basement Design and Method Statement Review at San Hao Ngon Lot 6K |
3/2018-5/2018 | Client: Star World Hotel Structural Appraisal of Star World Hotel |
10/2017-4/2018 | Client: IASM Accessibility Inspection and Composing Improvement Report of Social Service Facilities - Rehabilitation Day Centre |
9/2016-12/2016 | Client: GDI Evaluation of Design & Build of the Bridge of Artificial Island and New City Reclamation Zone Zone A |
2/2016-4/2016 | Client: Star World Hotel Structural Appraisal of Star World Hotel |
2013 | Client: Star World Hotel Structural Appraisal of Star World Hotel |
2012-2015 | Client: Consorcio de Long Chon/Tak Fat Kin Ip/Bahh Independent Checking of Construction Design for Galaxy Resort Phase II C004N032 |
2012 | Client: Wynn Design & Development Consultancy to Review Site Investigation and Soil Improvement in Wynn Cotai Project |
2011-2014 | Client: Empresa de Fomento Industrial e Comercial Concordia, S.A. Independent Checking of Civil & Structural Design for One Oasis, Macau |
2011-2013 | Client: SAAM Structural Consultancy Annual Services |
2010 | Client: Macau Baptist College Compiling the Bills of Quantities of Macau Baptist College Extension Project |
2010 | Client: GDI Feasibility Study for Water Storage of Nam Van Reservoir and Sai Van Reservoir |
2010 | Client: PRIC, PRISRC Geotechnical Inspection for the Feasibility Study for Capacity Increment of Ka Ho Reservoir |
2010 | Client: PRIC, PRISRC Geotechnical Inspection for the Feasibility Study for Water Storage of Nam Van Reservoir and Sai Van Reservoir |
2010 | Client: GDI Preliminary Study on Environmental Impact during Construction of Urbanization of Seac Pai Van Quarry in Coloane |
2009 | Client: GDI Preliminary Study on Connection Plan between University of Macau Site at Heng Qin and Cotai |
2009 | Client: Gold Cove Property Development Co. Ltd. Coordination and Technical Support in M&E Installation at The Residencia Macau |
2008-2009 | Client: CC Atelier de Arquitectura, Lda. Design Review and Signing for Caesar Golf Club |
2008-2009 | Client: Sun Fook Kong - Kun Fai JV Independent Checking of Construction Design for Parcels 5 and 6 in Venetian Resort Project |
2007 | Client: Fu Hou Seaview Garden Development Co. Ltd. Technical Assistance in Property Registration of Taipa Fu Hou Villa |
2005-2006 | Client: Seng Fok Holding Company Limited Serving as Technical Director in Hotel Rio Modification |
2004-2009 | Client: Leighton-China State J.V. Independent Checking of Construction Design for Wynn Resorts Macau Phase I and II |
2004-2006 | Client: Galaxy Casino, S.A. Serving as Authorized Person in Macau Starworld Hotel Structure Design |
2002 | Client: STDM External Wall Inspection of Hotel Sintra |
2002 | Client: Construction Control Division of Military Troop in Macau Preparation of Construction Estimate for Macau-Taipa Liberation Army Headquarter Project |
2001-2002 | Client: Bank of America Defect Appraisal of Bank of America Branch Office |
2001 | Client: JEC Consultants Co., Ltd. Loading Test at 8/F of Zhu Kwong Building |
2000 | Client: Macau Landmark Construction Feasibility Study Report of Macau Fisherman’s Wharf Project |
1999 | Client: SAAM Water Supply Master Plan Study Years 2000-2004, SAAM |
1999 | Client: SAAM Structural Appraisal of Taipa T-70 Reservoir |